Osceola County Building Permits: A Homeowner's Guide

Kissimmee, St. Cloud, and the county each issue their own permits. Here is how to find your office, what county permits cost, and where the $7,500 exemption differs.

PermitRoadmap Editorial Nov 23, 2026 7 min read
A single-story Osceola County, Florida home with a tile roof near a lake and cypress trees in warm afternoon light

Osceola County building permits come from one of three offices. The City of Kissimmee and the City of St. Cloud each issue permits inside their city limits, and Osceola County's Building and Permitting Office issues permits for unincorporated Osceola County through its Online Permit Center. Below: who to call, what the county charges, and where the $7,500 exemption differs. For a fast first answer, run the free permit checker.

Key takeaways

  • Kissimmee and St. Cloud issue their own building permits; Osceola County issues permits for unincorporated Osceola County.
  • Unincorporated Osceola County lists a re-roofing permit at $80.00 and windows or doors at $100.00, plus a 3% technology fee and a state surcharge, under fees effective October 2, 2026 (checked November 2026).
  • Kissimmee says windows, exterior doors, siding, and roofing always need a permit, even under $7,500.
  • Osceola County owner-builders cannot apply online; they deliver an Owner-Builder Statement/Affidavit in person or by mail.

Table of contents

A homeowner and a contractor looking over a printed site plan beside a Central Florida home near a lake

Who issues building permits in Osceola County?

Your city does if you live inside Kissimmee or St. Cloud; otherwise Osceola County does. Kissimmee's file for a permit page tells applicants to confirm the property is within city limits and says addresses in unincorporated Osceola County are handled by the county.

JurisdictionPermit officeOnline system
Unincorporated Osceola CountyBuilding and Permitting Office, 1 Courthouse Square, Suite 1400, KissimmeeOnline Permit Center (permits.osceola.org)
City of KissimmeePermitting Division, Development Services Center, 101 Church StreetCitizen Self-Service Portal (Energov)
City of St. CloudBuilding DepartmentBuilding Permit Portal

Kissimmee offers a Check City Limits map; see our pages for Kissimmee and unincorporated Osceola County for each office's details.

What projects need a permit in unincorporated Osceola County?

Most structural work and any change to electrical, gas, mechanical, or plumbing systems needs a permit. The county's permit information page lists residential examples:

  • Re-roofs, window and door replacement, and siding or stucco
  • Fences, sheds, screen rooms, carports, and wood decks
  • Pools, solar panels, HVAC, and gas, electrical, and plumbing work

The county says cosmetic interior work such as painting, tile, and cabinets, minor repairs such as carpet and light fixtures, drywall work, and swapping faucets without rerouting plumbing generally do not need a permit.

Does the $7,500 HB 803 exemption apply in Osceola County?

It can, for narrow non-trade work, but the county and Kissimmee read it differently. Section 553.79(1)(g), Florida Statutes, exempts qualifying work under $7,500 on a single-family home, excluding electrical, plumbing, structural, mechanical, and gas work and property in a flood hazard area.

ItemUnincorporated Osceola CountyCity of Kissimmee
How to requestOwner Disclosure of Exempt Work form, emailed to the Building OfficeExemption Notification Form, approved by the Building Official
Request fee$20.00 Permit Exemption Request (Residential)No building permit fee if the project qualifies
Windows, exterior doors, siding, roofingAsk the county before relying on itAlways need a permit
FencingAsk the county before relying on itCan qualify, not including pool barriers

Osceola County tells owners to confirm eligibility before starting, and Kissimmee's new permitting rules page says to keep the approved form on site. Our HB 803 exemption guide explains the statewide rules.

How much do building permits cost in unincorporated Osceola County?

The county charges mostly flat residential fees. These come from Appendix A, Building Permit and Related Fees, effective October 2, 2026 by Resolution #26-135R, checked in November 2026; fees change, so confirm before you budget.

Residential projectPublished fee
Re-roofing permit$80.00 permit fee, no plan review fee
Windows and/or doors$100.00, no plan review fee
Fences (wood, chain link, or vinyl/plastic)$60.00, including a $30.00 zoning review fee
Prefab shed$40.00, no plan review fee
Screen enclosure with screen or metal roof$60.00 plan review fee + $100.00 permit fee
In-ground swimming pool or spa$60.00 plan review fee + $160.00 permit fee
Solar photovoltaic, 0 to 9.99 kW DC$200.00
Mechanical permit base fee$125.00
Re-inspection$100.00

What gets added to the base fee?

Appendix A adds a 3% technology fee, a 3% archival fee on most building permit fees, and a State of Florida surcharge of 2.5% of the permit and plan review fee, or a $4.00 minimum. Failure to obtain a permit costs $80.00 plus double the normal permit fee.

A contractor installing a new white-framed window on a stucco home in Osceola County, Florida

Can I pull my own permit as an owner-builder in Osceola County?

Yes, if you qualify under section 489.103, Florida Statutes, which requires you to personally sign the permit application and supervise work not done by licensed contractors. In unincorporated Osceola County, owner-builders cannot apply online; they deliver the Owner-Builder Statement/Affidavit with the application in person or by mail.

Kissimmee's owner-builder page adds city conditions: corporations, LLCs, partnerships, and trusts must hire a licensed contractor; the home must have a Homestead Exemption; and you cannot sell, rent, or lease the property for at least one year after completing the project. Our owner-builder guide covers the liability.

When do I need a Notice of Commencement in Osceola County?

Osceola County says jobs valued over $5,000 need a Notice of Commencement that is notarized, recorded, and posted at the job site. Florida law excludes repair or replacement of an existing heating or air-conditioning system under $15,000.

A Notice of Commencement is a document the owner records so subcontractors and suppliers know who to notify about payment; the county posts the form on its permit applications page.

How long is an Osceola County building permit valid?

A county permit for a single-family dwelling expires one year after issuance or on the effective date of the next Florida Building Code edition, whichever is later. Applications expire six months after filing, and each can get at most two 90-day extensions, requested in writing before expiration ($40.00 for a residential permit extension).

A worked example: a fence in Kissimmee vs. unincorporated Osceola

A homeowner wants a $3,000 wood privacy fence on a single-family lot outside any flood hazard area, with no pool.

  • In Kissimmee: fencing that is not a pool barrier can qualify for the exemption, so the owner files the Exemption Notification Form and waits for the Building Official's stamped approval before building.
  • In unincorporated Osceola County: fences are on the county's permit-required list. The owner can ask whether it qualifies for an exemption ($20.00 request fee); if not, the fence permit is $60.00.

If the fence will serve as a pool barrier, treat it as permit-required in both places.

Our take: Settle the jurisdiction before you get quotes. The county and Kissimmee draw the exemption line differently, and an unapproved "exempt" job can end in a double fee.

What should I do before starting a project in Osceola County?

Confirm your jurisdiction, then the permit, fee, and paperwork, before you sign a contract.

  • Check city limits on Kissimmee's map, even with a Kissimmee mailing address.
  • Ask about exemptions in writing and keep the approved copy on site.
  • Plan the Notice of Commencement for jobs over $5,000.
  • Verify your contractor at MyFloridaLicense.com.

When you are ready, check your project in our free tool, then confirm every detail with your building department. Next door, our Orange County permit guide covers the neighboring county.

Frequently asked questions

Who issues building permits in Osceola County, Florida?
The City of Kissimmee and the City of St. Cloud issue building permits inside their city limits. Osceola County's Building and Permitting Office issues permits for unincorporated Osceola County through its Online Permit Center at permits.osceola.org. Kissimmee says to confirm your property is within city limits first and offers a Check City Limits map.
How much is a re-roof permit in unincorporated Osceola County?
Appendix A of the county fee schedule, effective October 2, 2026 by Resolution #26-135R, lists a re-roofing permit at $80.00 with no plan review fee. Re-roofing permits that involve removing and replacing solar panels are $150.00. A 3% technology fee and a state surcharge of 2.5% of the permit and plan review fee, with a $4.00 minimum, apply. Fees were checked in November 2026 and change.
Does Kissimmee require a permit for window or roof replacement under $7,500?
Yes. The City of Kissimmee says windows, exterior doors, siding, and roofing always need a permit, along with electrical, plumbing, mechanical, gas, and structural work and any work in a designated flood zone. Projects under $7,500 such as fencing (not pool barriers) can qualify for an exemption through the city's Exemption Notification Form.
Can an owner-builder apply online in Osceola County?
No. Osceola County says owner-builders acting as their own contractors cannot apply online. They complete the Owner-Builder Statement/Affidavit and deliver it with the permit application in person or by mail to the Permitting Office. Florida law also requires the owner to personally appear and sign the permit application.
How long is an Osceola County building permit good for?
Osceola County's fee schedule says a building permit issued by a county for a single-family dwelling expires one year after issuance or on the effective date of the next edition of the Florida Building Code, whichever is later. Permit extensions are limited to two 90-day extensions, and a residential permit extension costs $40.00.
When is a Notice of Commencement required in Osceola County?
Osceola County says jobs valued over $5,000 need a Notice of Commencement that is notarized, recorded, and posted at the job site. Under Florida law, repair or replacement of an existing heating or air-conditioning system under $15,000 is excluded from the permit office's copy requirement.

Sources

See what your project actually needs

Run the free check for your project and jurisdiction. Every result links back to its official source.

Check my project

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.