Lee County permits unincorporated areas, while Cape Coral, Fort Myers, Sanibel, and other cities run their own offices. Here is how fees, flood zones, and the 50% rule shape your project.

PermitRoadmap Editorial Nov 19, 2026 8 min read
A raised single-family Lee County, Florida home on a Cape Coral canal with a boat dock and palm trees in warm evening light

Lee County, Florida building permits are issued by Lee County Community Development for unincorporated areas, and by the city, town, or village for property inside an incorporated area such as Cape Coral or Fort Myers. Flood rules shape most Lee County projects, because the 50% rule can require a damaged or remodeled home to meet current flood standards. For a fast first answer, run the free permit checker.

Key takeaways

  • Lee County Community Development handles permitting, plan review, and inspections for unincorporated Lee County; incorporated cities and towns run their own permitting.
  • Unincorporated Lee charges a $50 application fee and a $35 technology fee per application, plus review and inspection fees, under the schedule effective April 15, 2026 (fees checked November 2026).
  • Under the 50% rule, a building in a flood zone whose improvement or repair cost equals or exceeds 50% of the structure's market value must be brought into compliance with current flood regulations.
  • Cape Coral says more than 60% of the city is in the Special Flood Hazard Area, so Florida's $7,500 permit exemption will not apply to most projects there.
  • A copy of the recorded Notice of Commencement is due before the first inspection when the direct contract is over $5,000, except A/C repair or replacement under $15,000.

Table of contents

A homeowner and a contractor reviewing a simple printed floor plan on the lanai of a Southwest Florida canal home

Who issues building permits in Lee County, Florida?

The county issues permits only for unincorporated Lee County, through Lee County Community Development. The county's floodplain page sends residents of Fort Myers, Cape Coral, Fort Myers Beach, Bonita Springs, and Estero to their own jurisdictions. Sanibel runs its own Building Department as well.

To check whether a parcel is unincorporated, the county points to its Resident Information Tool. Our Cape Coral permit page gathers that city's forms and fees.

Which permit portal does my Lee County office use?

Each office runs its own system. These names come from each office's site, checked in November 2026.

JurisdictionOnline permit system
Unincorporated Lee CountyeConnect/ACA (Accela)
Cape CoralEnerGov Citizen Self-Service (CSS)
SanibelCityView for new permits; EnerGov for existing permits
Fort MyersSelf-service portal linked from the city's Permitting button

Cape Coral takes all permit applications through EnerGov, not at the counter, and expects owner-builders to apply online beginning July 1, 2026. In unincorporated Lee, owner-builders may apply online or in person.

How much do building permits cost in Lee County?

Fees depend on the office. Unincorporated Lee's building permit fee schedule, effective April 15, 2026, adds a $50 application fee, a $35 technology fee, and an operational support fee (a percentage of review and inspection fees) to each application. Cape Coral prints a miscellaneous permit fee schedule effective January 1, 2026. Figures below were copied in November 2026; fees change, so confirm before you budget.

Residential projectUnincorporated Lee CountyCape Coral
Re-roof$25 initial plan review; $100 inspectionNo separate re-roof line; the only flat roofing item is "Roofing Miscellaneous: $100.00" (ask the city which applies)
Windows, doors, shutters$35 initial plan review; $50 structural inspectionWindow and door replacement: $113.00
Fence$35 plan review; $25 regulatory review; $50 per required inspectionFences, residential: $107.00
Re-inspection$50 per inspection$48.00 for the first, per discipline
Pool$35 plan review; $25 regulatory review; $50 per required inspectionSwimming pool, residential: $307.00

Cape Coral adds a 2.5% surcharge to permits associated with enforcing the Florida Building Code, and a floodplain review costs $55.00 per review. In unincorporated Lee, work started without a permit costs double the total review and inspection fees, with a $200 minimum.

What is the 50% rule, and how does it affect my project?

The 50% rule applies when your building is in a FEMA Special Flood Hazard Area and is not flood compliant. If the cost of improvements or repairs equals or exceeds 50% of the structure's market value, the building must be brought into compliance with current flood regulations, which can mean elevating it.

Substantial improvement is any reconstruction, rehabilitation, addition, or other improvement costing 50% or more of the structure's market value. Substantial damage is damage whose repair to before-damage condition would cost 50% or more of that value.

How does unincorporated Lee measure it?

According to the county's 50% rule page:

  • The county uses the Property Appraiser's assessed value of the structure, excluding land. You may submit an appraisal from a Florida licensed appraiser if you disagree.
  • Damage repairs are priced at pre-storm rates.
  • Plans, surveys, permits, sidewalks, pools, screens, sheds, gazebos, and fences are not counted.
  • A substantially improved or damaged building must be elevated to the base flood elevation plus one foot of freeboard.

Cape Coral requires a permit for all improvements and repairs in the Special Flood Hazard Area, including its Substantial Improvement/Substantial Damage application. FEMA's updated Lee County flood maps take effect March 2, 2027. Our flood zone permit guide explains elevation certificates.

What can I repair after a hurricane without a permit?

Very little. Unincorporated Lee's disaster recovery page says anything not on its short list needs a permit first. The list includes debris removal, temporary shoring and bracing, replacing broken glass in existing window and door frames, minor non-structural exterior repairs, and replacing no more than one square (10 by 10 feet) of roof shingles. Substantial damage determinations are made during permit review.

A contractor measuring storm damage on the exterior wall of a raised Southwest Florida home with palms behind

Does the $7,500 permit exemption apply in Lee County?

Rarely, because flood zones are excluded. Section 553.79(1)(g), Florida Statutes, exempts single-family work valued under $7,500, but not on property partly or entirely in a flood hazard area, and not electrical, plumbing, structural, mechanical, or gas work.

Cape Coral says more than 60% of the city is in the Special Flood Hazard Area, so the exemption will not apply to most projects. Eligible owners still apply through the city's online system and pay an administrative review fee, and work may not begin until the city approves the request, per its HB 803 page. See our $7,500 exemption guide.

Can I pull my own permit as an owner-builder in Lee County?

Yes, if you qualify under section 489.103(7), Florida Statutes, for a one-family or two-family home for your own use that is not offered for sale or lease; a sale or lease within one year after completion creates a presumption that you built it for sale or lease. You must personally appear and sign the permit application, and unincorporated Lee says all owner-builders must appear in person to sign documents for issuance. Cape Coral posts an Owner-Builder Disclosure form.

Do I need a Notice of Commencement?

Yes, when the direct contract is over $5,000. A Notice of Commencement (NOC) is a document the owner records so subcontractors and suppliers know who to notify about payment, and a copy is due before the first inspection. A/C repair or replacement under $15,000 is excluded. Our Notice of Commencement guide walks through it.

What happens with a small remodel in a Cape Coral flood zone?

Here is a worked example. A Cape Coral owner of a canal-front single-family home in an AE zone plans $6,500 of new cabinets and countertops, with no plumbing or electrical changes.

  1. Check the flood zone. The city's Forerunner lookup shows the home is in the flood hazard area.
  2. Rule out the exemption. The job is under $7,500, but flood zone property is not eligible, so normal permitting applies.
  3. Apply online. The contractor files in EnerGov with the city's Substantial Improvement/Substantial Damage application.
  4. Run the 50% check. The city uses that application to compare the project cost against 50% of the structure's market value.
  5. Record the NOC. The contract is over $5,000, so a copy goes in before the first inspection.

What should I do before starting a project in Lee County?

Confirm your jurisdiction and flood zone first, then fees and forms.

  • Check jurisdiction with the county's Resident Information Tool.
  • Look up your flood zone and any elevation certificate on file.
  • Get a detailed estimate if the work might approach 50% of the structure's value.
  • Plan the NOC if the contract is over $5,000.

Our take: In Lee County, find your flood zone before you choose a contractor or a budget. A remodel that crosses the 50% line can turn into an elevation project, and the time to learn that is before work starts, not at inspection.

When you are ready, check your project in our free tool, then confirm the details with your building department.

Frequently asked questions

Who issues building permits in Lee County, Florida?
Lee County Community Development handles permitting, plan review, and inspections for unincorporated Lee County. Incorporated areas such as Cape Coral, Fort Myers, Fort Myers Beach, Bonita Springs, and Estero are sent to their own jurisdictions, and Sanibel runs its own Building Department. The county's Resident Information Tool shows whether a parcel is unincorporated.
How much does a building permit cost in unincorporated Lee County?
Under the fee schedule effective April 15, 2026, each application carries a $50 application fee, a $35 technology fee, and an operational support fee calculated as a percentage of review and inspection fees. Review and inspection fees depend on the record type; a residential re-roof, for example, has a $25 initial plan review and a $100 inspection. These figures were checked in November 2026 and can change.
What is the 50% rule in Lee County?
If a building in a FEMA Special Flood Hazard Area is not flood compliant and the cost of improvements or repairs equals or exceeds 50% of the structure's market value, it must be brought into compliance with current flood regulations. Unincorporated Lee uses the Property Appraiser's assessed value of the structure, excluding land, and a substantially improved or damaged building must be elevated to the base flood elevation plus one foot.
Can I use the $7,500 permit exemption in Cape Coral?
Probably not. Cape Coral says more than 60% of the city is in the Special Flood Hazard Area, and Florida's exemption does not apply to property partly or entirely in a flood hazard area or to electrical, plumbing, mechanical, gas, or structural work. Eligible owners must still apply through the city's online system, pay an administrative review fee, and wait for approval before starting.
Do I need a permit for hurricane repairs in unincorporated Lee County?
Usually yes. Lee County's disaster recovery page lists limited work that does not need a permit, such as debris removal, temporary shoring and bracing, replacing broken glass in existing window and door frames, minor non-structural exterior repairs, and replacing one square (10 by 10 feet) or less of roof shingles. Anything not on the list needs a permit before work starts.
Can owner-builders apply online in Lee County?
In unincorporated Lee, owner-builders may apply online or in person, but all owner-builders must appear in person to sign documents before the permit is issued. Cape Coral says owner-builders are expected to submit applications through its EnerGov portal beginning July 1, 2026.

Sources

See what your project actually needs

Run the free check for your project and jurisdiction. Every result links back to its official source.

Check my project

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.

More guides