Skip to content
PermitRoadmap

Do I need a permit for shed or accessory structure in Brookhaven?

Permit may be required

It depends. Whether shed or accessory structure needs a permit in Brookhaven comes down to the details of your project.

The 200 square foot figure quoted for Georgia is a model figure, not an enforceable statewide threshold. It appears at Section R105.2 of the International Residential Code with Georgia Amendments, but the Georgia amendments delete Chapter 1, Scope and Administration, without substitution and keep it in the code only as a reference and guide for local governments to use in the development of their own administrative procedures. Georgia jurisdictions that follow that guidance exempt one-story detached accessory structures other than storm shelters up to 200 square feet, but the threshold that binds at your address is the local one. Several Georgia cities draw the line lower, so do not assume 200 applies where you live. Sandy Springs requires a permit for detached structures of 120 square feet or larger, and Savannah requires one for a new closed-roof accessory structure over 120 square feet. Ask your building department for the figure that applies at your address. A local size exemption is an exemption from the permit, not from the rules. Zoning setbacks, height limits and lot coverage still apply, and so does the construction standard in the body of the Georgia residential code. Running electrical or plumbing to the shed triggers a separate trade permit regardless of the structure size. DeKalb County's own permitting office is the DeKalb County Planning and Sustainability, reachable on 404-371-2155 at https://dekalbcountyga.gov/departments/planning-and-sustainability/permits-plan-review-and-inspections. Its online permit portal is https://epermits.dekalbcountyga.gov/. It issues permits for the unincorporated county. If your city does not run its own building department, and many smaller Georgia municipalities do not, this is the office that will handle the job. DeKalb County sits inside the Metropolitan North Georgia Water Planning District, created by the Georgia General Assembly in 2001. Every local government in the District, cities included, has to adopt the District's model post-construction stormwater ordinance or an equivalent one at least as effective, so these rules follow you into any city in the county rather than stopping at the unincorporated line. A shed on a concrete slab adds impervious surface. A single shed rarely reaches the threshold on its own, but it counts toward the total if you are also adding paving or a pool. In practice the thresholds are aimed at larger development rather than ordinary homeowner work, so most single-family projects sit below them. Cobb County, for example, publishes its trigger as adding more than 5,000 square feet of impervious surface or disturbing more than an acre. Each local government sets its own figures, so check yours before assuming. Where it does apply, the current standard is to retain the first 1.0 inch of rainfall on the site to the maximum extent practicable, which usually means a detention or infiltration feature rather than just grading water to the street. Brookhaven Code Sec. 7-118(d)(1)(i) exempts detached accessory structures of 100 square feet or less from a building permit. Larger sheds need a building permit through the Addition / Accessory Structure process. Even a small shed counts as new impervious surface: the city's Minor Site Work Permit Reference Guide lists detached buildings and sheds under 100 square feet as minor site work, and allows them to be hand-drawn on an existing survey or plat. Under Zoning Sec. 27-696, accessory buildings must be at least 10 feet from the house unless they sit entirely within the principal building setbacks, and each single-family lot may have one accessory structure up to 120 square feet that is exempt from those accessory building rules.

Documents you may need

  • Permit applicationLikely required
  • Site plan showing setbacks and property linesLikely required
  • Structure plans or manufacturer specificationsSometimes required
  • Stormwater or erosion control plan where the project reaches the local thresholdSometimes required
  • Brookhaven building permit application through the Project Portal (Addition / Accessory Structure)Sometimes required
  • Minor Site Work Permit application with site planSometimes required
  • Site plan, scaled construction drawings, and Residential Plan Review Data SheetSometimes required
  • DeKalb County easement approval (routed by the city after acceptance)Sometimes required

Possible inspections

  • Footing / foundation inspection (for permanent structures)
  • Final inspection
  • Initial and final site inspections by the land development inspector
  • Final building inspection

Frequently asked questions

Do I need a permit for shed or accessory structure in Brookhaven?
It depends. Whether shed or accessory structure needs a permit in Brookhaven comes down to the details of your project. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Brookhaven?
The local building department for Brookhaven handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.