Do I need a permit for shed or accessory structure in Davie?
Yes. In Florida, shed or accessory structure generally requires a permit, and Davie is no exception.
Florida has no statewide small-shed exemption. The widely repeated rule that a shed under 120 square feet needs no permit comes from the model International Codes, and Florida did not adopt it: section 105.2 of the Florida Building Code, Building exempts only specified gas, mechanical and plumbing work, with no category exempting detached accessory structures. Where a size threshold exists it is a local ordinance, and it genuinely differs, so ask your building department for the line that applies at your address. Any shed with electricity, plumbing or a permanent foundation needs a permit regardless of size, and zoning setbacks, flood zone rules and wind anchoring apply even when no building permit is required.
Florida and local notes for Davie
Even a modest shed is reviewed for HVHZ wind resistance and anchoring here, so a structure sold as exempt elsewhere in Florida may still need approval. Your city issues the permit, not the county. Broward's 31 municipal building departments each run their own permitting and inspections, while the county Board of Rules and Appeals sets code interpretation and the countywide amendments they all work from. The Broward County Amendments to the Florida Building Code, published by the Board of Rules and Appeals under the county charter, apply on top of the state code everywhere in the county. Individual cities can add their own amendments as well, so confirm both. The Town of Davie FAQ states that a building permit is required to install a shed, and that a shed must have Florida product approval, a Miami-Dade Notice of Acceptance, or signed and sealed engineer shop drawings to qualify for the High Velocity Hurricane Zone. Davie Code 12-88(C) lets a storage shed sit 5 feet from side and rear lot lines only if it is no larger than 150 square feet measured from the drip line, is behind the rear building line, and is not air-conditioned or designed for habitation. Under Davie Code 12-33(A), accessory buildings in residential districts are limited to one story and cannot be taller than the house.
Documents you may need
- Permit applicationLikely required
- Site plan showing setbacksLikely required
- Structure dimensions or manufacturer drawingsSometimes required
- Anchoring or tie-down detailsSometimes required
- Permit or zoning applicationLikely required
- Site plan showing setbacks and distance to lot linesLikely required
- Anchoring or tie-down details for wind loadSometimes required
- Product approval or Notice of Acceptance documentation for HVHZ rated materialsSometimes required
- Town of Davie building permit application submitted through OASLikely required
- Davie Addendum Form with HOA acknowledgmentLikely required
- Florida product approval, Miami-Dade Notice of Acceptance, or signed and sealed engineer shop drawings for the shedLikely required
- Site plan or survey showing shed location and setbacksLikely required
Possible inspections
- Foundation or slab inspection
- Framing and anchoring inspection
- Final inspection
- Tie-down or anchoring inspection
Frequently asked questions
- Do I need a permit for shed or accessory structure in Davie?
- Yes. In Florida, shed or accessory structure generally requires a permit, and Davie is no exception. The documents and inspections sections on this page list what the building department typically asks for.
- Who issues the permit in Davie?
- The local building department for Davie handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
- How do I find out the exact requirements for my project?
- Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.