Do I need a permit for swimming pool or spa in Cleveland?

Permit required

Yes. In Ohio, swimming pool or spa generally requires a permit, and Cleveland is no exception.

A permanent in-ground or above-ground pool involves structural and electrical work, so under the Residential Code of Ohio it requires building and electrical permits and is never covered by the minor-repair exemption. The RCO requires a compliant barrier (fencing, self-closing and self-latching gate, and alarms as applicable) before the pool is approved for use. Cleveland requires a permit for a private swimming pool holding more than 1,500 gallons or deeper than two feet, so most in-ground and larger above-ground pools require one. Barrier, fencing and electrical bonding requirements come from the Residential Code of Ohio and the Cleveland Building and Zoning Codes; confirm current barrier rules with the Department of Building and Housing. Pool wiring requires an electrical permit pulled by a state-licensed, city-registered contractor, all filed through the Accela portal.

Documents you may need

  • Building permit applicationrequired
  • Site plan showing pool, setbacks, and barrierrequired
  • Electrical permit for bonding, pump, and equipmentrequired
  • Barrier / safety enclosure detailsrequired
  • Pool Permit / Residential Building Permit Applicationrequired
  • Site plan showing pool location, setbacks and barrier/fencingrequired
  • Electrical permit for pool equipment bonding and wiringLikely required

Possible inspections

  • Steel / bonding and pre-gunite inspection for in-ground pools
  • Electrical rough and final inspection (equipment bonding)
  • Barrier / final safety inspection
  • Barrier/fence inspection
  • Electrical bonding and equipment inspection
  • Final inspection

Frequently asked questions

Do I need a permit for swimming pool or spa in Cleveland?
Yes. In Ohio, swimming pool or spa generally requires a permit, and Cleveland is no exception. A permanent in-ground or above-ground pool involves structural and electrical work, so under the Residential Code of Ohio it requires building and electrical permits and is never covered by the minor-repair exemption. The RCO requires a compliant barrier (fencing, self-closing and self-latching gate, and alarms as applicable) before the pool is approved for use. Cleveland requires a permit for a private swimming pool holding more than 1,500 gallons or deeper than two feet, so most in-ground and larger above-ground pools require one. Barrier, fencing and electrical bonding requirements come from the Residential Code of Ohio and the Cleveland Building and Zoning Codes; confirm current barrier rules with the Department of Building and Housing. Pool wiring requires an electrical permit pulled by a state-licensed, city-registered contractor, all filed through the Accela portal.
Who issues the permit in Cleveland?
The local building department for Cleveland handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?