Do I need a permit for solar panel installation in City of Asheville?

Permit required

Yes. In North Carolina, solar panel installation generally requires a permit, and City of Asheville is no exception.

A rooftop or ground-mounted PV system involves both structural and electrical work, so it is never covered by the NCGS 160D-1110 minor-work exemption and requires a permit. Interconnection with the utility is a separate approval from your building permit; both must be completed before the system is energized. Solar carries an electrical scope, which is excluded from North Carolina's minor-work exemption, so a rooftop PV system in Asheville requires a permit regardless of cost. Homeowners who want to perform their own electrical wiring in Asheville must first pass the city homeowner electrical exam; otherwise a licensed electrical contractor must pull the electrical permit. Ground-mounted arrays and roof loads on steep-slope or hillside lots can trigger added engineering and slope review, so confirm requirements with the Development Services Department before ordering equipment. Buncombe County's own permitting office is the Buncombe County Permits and Inspections office, reachable on 828-250-5360 at https://www.buncombenc.gov/424/Permits-Inspections. Its online permit portal is https://aca-prod.accela.com/buncombeconc/default.aspx. It issues permits for the unincorporated county. If your city does not run its own building department, this is the office that will handle the job, and that is more common in North Carolina than most states: the county is often the building authority even inside city limits, with the city handling only zoning. Solar involves a building permit for the attachment and a separate electrical permit, plus a utility interconnection that runs outside the permit process.

Documents you may need

  • Building / electrical permit applicationrequired
  • Site plan and roof / array layoutrequired
  • Structural documentation (roof load / attachment)Likely required
  • Electrical line diagram and equipment specsrequired
  • Residential Permit Application (with an electrical trade permit) through the City of Asheville Development Portal or Citizen Access siterequired
  • Plan set with the array layout, inverter and mounting details, wiring schematic, and manufacturer specification sheetsrequired
  • Structural or roof attachment details, with a slope stability certification where the property is in a steep-slope areaSometimes required

Possible inspections

  • Mounting / structural attachment inspection
  • Electrical rough and final inspection
  • Final inspection (with utility interconnection sign-off)
  • Mounting and structural inspection for the array attachment
  • Electrical inspection of the PV wiring and interconnection
  • Final inspection, with utility interconnection coordinated separately

Frequently asked questions

Do I need a permit for solar panel installation in City of Asheville?
Yes. In North Carolina, solar panel installation generally requires a permit, and City of Asheville is no exception. A rooftop or ground-mounted PV system involves both structural and electrical work, so it is never covered by the NCGS 160D-1110 minor-work exemption and requires a permit. Interconnection with the utility is a separate approval from your building permit; both must be completed before the system is energized. Solar carries an electrical scope, which is excluded from North Carolina's minor-work exemption, so a rooftop PV system in Asheville requires a permit regardless of cost. Homeowners who want to perform their own electrical wiring in Asheville must first pass the city homeowner electrical exam; otherwise a licensed electrical contractor must pull the electrical permit. Ground-mounted arrays and roof loads on steep-slope or hillside lots can trigger added engineering and slope review, so confirm requirements with the Development Services Department before ordering equipment. Buncombe County's own permitting office is the Buncombe County Permits and Inspections office, reachable on 828-250-5360 at https://www.buncombenc.gov/424/Permits-Inspections. Its online permit portal is https://aca-prod.accela.com/buncombeconc/default.aspx. It issues permits for the unincorporated county. If your city does not run its own building department, this is the office that will handle the job, and that is more common in North Carolina than most states: the county is often the building authority even inside city limits, with the city handling only zoning. Solar involves a building permit for the attachment and a separate electrical permit, plus a utility interconnection that runs outside the permit process.
Who issues the permit in City of Asheville?
The local building department for City of Asheville handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?