Skip to content
PermitRoadmap

Do I need a permit for shed or accessory structure in Highland Park?

Permit likely required

Most likely yes. Shed or accessory structure usually requires a permit in Illinois. Confirm the specifics with Highland Park.

Highland Park publishes a specific Shed permit requirements sheet and separate sheets for detached garages and other detached accessory structures, so a permit is expected for a backyard shed. Confirm the exact size threshold and whether your shed qualifies with the Highland Park Building Division before you build. Accessory structures must meet Chapter 150 zoning setback and lot-coverage rules even when they are small, and a plat of survey is used to verify placement. Do not assume a shed is exempt because it is not on a foundation. If your lot includes a ravine, bluff, or regulated drainage area, additional grading, stormwater, or Lake County Watershed Development review may apply to where the structure can go. Illinois has no single statewide shed threshold, so the 200 square foot figure quoted from the model International Residential Code does not govern here. Requirements are set by each municipality, and the ones we have checked are stricter than that figure: Wheaton does not require a building permit for a shed of 120 square feet or less, and Joliet requires a shed permit with a Residential Accessory Structures Review Form and a plat of survey showing the shed location. Assume the local number rather than a national one, and ask your building department for the threshold that applies at your address before you buy the shed. Zoning setbacks, easements and lot coverage still apply where no building permit is needed, and running electrical or plumbing to the shed triggers its own permit. A shed that will have electricity, plumbing, or a permanent foundation falls outside the usual small accessory building exemption, which generally covers simple unpowered structures only. Electrical and plumbing work each normally require their own permit and inspection even when the structure itself would have been exempt, and many jurisdictions require a licensed electrician or plumber to pull them. Zoning setbacks, height limits, and lot coverage are reviewed separately from the building permit, so confirm placement with your local department before the shed is delivered or poured.

Documents you may need

  • Building permit application filed through the City's Civic Access self-service portalLikely required
  • Plat of survey showing the shed location, size, and zoning setbacksLikely required
  • Shed submittal package per the City's Shed permit requirementsLikely required
  • Site plan showing setbacks from property linesLikely required
  • Structure dimensions and floor arearequired

Possible inspections

  • Final building inspection of the accessory structure by the Highland Park Building Division (footing or setback inspection may also apply)
  • Final inspection (when a permit applies)

Frequently asked questions

Do I need a permit for shed or accessory structure in Highland Park?
Most likely yes. Shed or accessory structure usually requires a permit in Illinois. Confirm the specifics with Highland Park. Highland Park publishes a specific Shed permit requirements sheet and separate sheets for detached garages and other detached accessory structures, so a permit is expected for a backyard shed. Confirm the exact size threshold and whether your shed qualifies with the Highland Park Building Division before you build. Accessory structures must meet Chapter 150 zoning setback and lot-coverage rules even when they are small, and a plat of survey is used to verify placement. Do not assume a shed is exempt because it is not on a foundation. If your lot includes a ravine, bluff, or regulated drainage area, additional grading, stormwater, or Lake County Watershed Development review may apply to where the structure can go. Illinois has no single statewide shed threshold, so the 200 square foot figure quoted from the model International Residential Code does not govern here. Requirements are set by each municipality, and the ones we have checked are stricter than that figure: Wheaton does not require a building permit for a shed of 120 square feet or less, and Joliet requires a shed permit with a Residential Accessory Structures Review Form and a plat of survey showing the shed location. Assume the local number rather than a national one, and ask your building department for the threshold that applies at your address before you buy the shed. Zoning setbacks, easements and lot coverage still apply where no building permit is needed, and running electrical or plumbing to the shed triggers its own permit. A shed that will have electricity, plumbing, or a permanent foundation falls outside the usual small accessory building exemption, which generally covers simple unpowered structures only. Electrical and plumbing work each normally require their own permit and inspection even when the structure itself would have been exempt, and many jurisdictions require a licensed electrician or plumber to pull them. Zoning setbacks, height limits, and lot coverage are reviewed separately from the building permit, so confirm placement with your local department before the shed is delivered or poured.
Who issues the permit in Highland Park?
The local building department for Highland Park handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.