Do I need a permit for electrical panel or service upgrade in Unincorporated Paulding County?

Permit required

Yes. In Georgia, electrical panel or service upgrade generally requires a permit, and Unincorporated Paulding County is no exception.

Panel changes and service upgrades require an electrical permit and inspection in Georgia; the power company usually will not reconnect an upgraded service without a passed inspection. Work must meet the adopted National Electrical Code as amended for Georgia; most jurisdictions require a licensed electrician. Paulding County's own permitting office is the Paulding County Building and Permitting Division, reachable on 770-443-7571 at https://www.paulding.gov/105/Building-Permitting-Division. It issues permits for the unincorporated county. If your city does not run its own building department, and many smaller Georgia municipalities do not, this is the office that will handle the job. A service change needs the inspection to clear before the utility resets the meter, so schedule it before the changeover day. Code Sec. 18-61 requires a permit to replace or alter any electrical system, and Paulding's Electrical Permit carries a $100.00 minimum fee, with service fees based on amperage. Under Code Sec. 18-74, the utility may not reconnect a permitted system until the county building official releases it. The application asks which utility serves the site: GreyStone Power, Cobb EMC, Georgia Power or Carroll EMC.

Documents you may need

  • Electrical / technical permit applicationRequired
  • Panel and service load / equipment detailsLikely required
  • Contractor license and insurance informationLikely required
  • Paulding County Electrical Permit applicationLikely required
  • Georgia state electrical license card numberLikely required

Possible inspections

  • Electrical rough / service inspection
  • Final electrical inspection (utility reconnect may be required)
  • Service inspection before the utility reconnects
  • Final inspection

Frequently asked questions

Do I need a permit for electrical panel or service upgrade in Unincorporated Paulding County?
Yes. In Georgia, electrical panel or service upgrade generally requires a permit, and Unincorporated Paulding County is no exception. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Unincorporated Paulding County?
The local building department for Unincorporated Paulding County handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.