Permit required

Yes. In Georgia, standby generator installation generally requires a permit, and Chattahoochee Hills is no exception.

A permanently installed standby generator with a transfer switch requires an electrical permit, and a gas connection adds a separate gas or mechanical permit and inspection. Confirm setback and clearance rules from the house, property lines, and openings before placing the unit. Fulton County's own permitting office is the Fulton County Planning, Zoning and Permitting, reachable on 404-612-7400 at https://www.fultoncountyga.gov/inside-fulton-county/fulton-county-departments/public-works/planning-zoning-and-permitting. It issues permits for the unincorporated county. If your city does not run its own building department, and many smaller Georgia municipalities do not, this is the office that will handle the job. A permanent generator involves electrical and, on gas units, fuel gas permits, plus setback review for the pad. Chattahoochee Hills permits are handled by the Chattahoochee Hills Community Development office, reachable on 770-463-8881 at https://www.chatthillsga.us/departments/community_development.php. Fulton County also issues permits for the unincorporated county, and many smaller Georgia municipalities contract building services to it rather than running a department of their own, so confirm which office covers your address before you apply.

Documents you may need

  • Electrical permit application (plus gas/mechanical if fuel-connected)required
  • Site plan showing generator location and clearancesLikely required
  • Equipment and transfer switch specificationsLikely required
  • Contractor license and insurance informationLikely required

Possible inspections

  • Electrical rough / transfer switch inspection
  • Gas / fuel line inspection (for natural gas or propane units)
  • Final inspection

Frequently asked questions

Do I need a permit for standby generator installation in Chattahoochee Hills?
Yes. In Georgia, standby generator installation generally requires a permit, and Chattahoochee Hills is no exception. A permanently installed standby generator with a transfer switch requires an electrical permit, and a gas connection adds a separate gas or mechanical permit and inspection. Confirm setback and clearance rules from the house, property lines, and openings before placing the unit. Fulton County's own permitting office is the Fulton County Planning, Zoning and Permitting, reachable on 404-612-7400 at https://www.fultoncountyga.gov/inside-fulton-county/fulton-county-departments/public-works/planning-zoning-and-permitting. It issues permits for the unincorporated county. If your city does not run its own building department, and many smaller Georgia municipalities do not, this is the office that will handle the job. A permanent generator involves electrical and, on gas units, fuel gas permits, plus setback review for the pad. Chattahoochee Hills permits are handled by the Chattahoochee Hills Community Development office, reachable on 770-463-8881 at https://www.chatthillsga.us/departments/community_development.php. Fulton County also issues permits for the unincorporated county, and many smaller Georgia municipalities contract building services to it rather than running a department of their own, so confirm which office covers your address before you apply.
Who issues the permit in Chattahoochee Hills?
The local building department for Chattahoochee Hills handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.