Do I need a permit for solar panel installation in Unincorporated Lee County?

Permit required

Yes. In Florida, solar panel installation generally requires a permit, and Unincorporated Lee County is no exception.

Rooftop residential solar requires a permit in Florida, typically an electrical permit and often a building or structural review for the roof attachment and wind load. A separate utility interconnection or net-metering agreement is also required and is distinct from the building permit. Many Florida counties, including Orange, offer expedited solar permitting.

Local detail for Unincorporated Lee County: Serves all unincorporated areas of Lee County. Permits submitted online via Accela Citizen Access.

Florida and local notes for Unincorporated Lee County

Requirements vary between electrical-only and combined building plus electrical review. The utility interconnection agreement is separate from the permit and must be arranged with your power company. Lee County's own permitting office is the Lee County Community Development Department - Building & Permitting Services, reachable on (239) 533-8329 at https://www.leegov.com/dcd. Its online permit portal is https://aca-prod.accela.com/LEECO/Cap/CapHome.aspx?module=Permitting. It issues permits for the unincorporated county. If your city does not run its own building department, and many smaller Florida municipalities do not, this is the office that will handle the job. Solar involves a building permit for the attachment and a separate electrical permit, plus a utility interconnection that runs outside the permit process. Lee County requires a Solar/Photovoltaic permit to add or modify any PV system, solar pool heater, solar water heater, or rooftop HVAC collector. The county requires signed and sealed wind load documentation from a Florida design professional, and documentation that the system weighs under 5 pounds per square foot and under 45 pounds per roof attachment point.

Documents you may need

  • Permit applicationLikely required
  • Electrical plan or one-line diagramLikely required
  • Roof and panel layout with structural attachment detailsLikely required
  • Equipment specification sheetsSometimes required
  • Utility interconnection applicationLikely required
  • Solar/Photovoltaic permit application in eConnectLikely required
  • Site plan showing solar components and the point of interconnectionLikely required
  • Electrical diagram (array configuration, wiring, overcurrent protection, inverter, disconnects, signage, AC connection)Likely required
  • Manufacturer specifications for all componentsLikely required
  • Signed and sealed wind load documentation with the roof uplift zone and pressureLikely required
  • Weight documentation showing under 5 psf distributed and under 45 pounds per roof attachmentLikely required
  • No-Rise Certification signed and sealed by a Florida engineer, for land-disturbing work in a regulatory floodwaySometimes required
  • Owner-Builder Disclosure Statement, if the owner is acting as the contractorSometimes required

Possible inspections

  • Mounting or structural inspection
  • Rough electrical inspection
  • Final electrical and building inspection
  • 207 Solar Final
  • 305 Electrical Final
  • 101 Foundation/Footing for ground-mounted arrays

Frequently asked questions

Do I need a permit for solar panel installation in Unincorporated Lee County?
Yes. In Florida, solar panel installation generally requires a permit, and Unincorporated Lee County is no exception. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Unincorporated Lee County?
The local building department for Unincorporated Lee County handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?