Do I need a permit for shed or accessory structure in Golden?

Permit may be required

It depends. Whether shed or accessory structure needs a permit in Golden comes down to the details of your project.

Golden treats a one-story detached accessory structure under 200 square feet (residential) as not requiring a building permit, but larger storage sheds and accessory buildings do require a permit and plan review. Even permit-exempt sheds must still meet Golden's zoning setback, size, and height rules, reviewed through a Planning Miscellaneous Structure Application. Confirm the size threshold and zoning setbacks for your lot with the Golden Building Division and Planning Department. A shed that will have electricity, plumbing, or a permanent foundation falls outside the usual small accessory building exemption, which generally covers simple unpowered structures only. Electrical and plumbing work each normally require their own permit and inspection even when the structure itself would have been exempt, and many jurisdictions require a licensed electrician or plumber to pull them. Zoning setbacks, height limits, and lot coverage are reviewed separately from the building permit, so confirm placement with your local department before the shed is delivered or poured. Colorado sets shed rules locally rather than through one statewide threshold, so the 200 square foot figure from the model International Residential Code does not govern here. Every Colorado jurisdiction we have checked uses 120 square feet instead: Aurora exempts a one-story detached shed or playhouse of 120 square feet or less, Arvada requires a permit above 120, and Wheat Ridge requires one above 120. In parts of Colorado a single regional building department serves a county and several cities at once, so confirm which office covers your address before you rely on any threshold. A building-permit exemption does not waive zoning setbacks or HOA rules, and running power to the shed still requires an electrical permit.

Documents you may need

  • Miscellaneous Structure Application (Planning) or building permit applicationSometimes required
  • Site plan showing setbacks, size, and heightLikely required
  • Structural / foundation details for larger structuresSometimes required
  • Permit applicationLikely required
  • Site plan showing the structure and setbacks from property linesrequired
  • Foundation/anchoring and structural details for larger shedsSometimes required

Possible inspections

  • Foundation / setback inspection where applicable
  • Final inspection
  • Setback/footing inspection where a foundation is required

Frequently asked questions

Do I need a permit for shed or accessory structure in Golden?
It depends. Whether shed or accessory structure needs a permit in Golden comes down to the details of your project. Golden treats a one-story detached accessory structure under 200 square feet (residential) as not requiring a building permit, but larger storage sheds and accessory buildings do require a permit and plan review. Even permit-exempt sheds must still meet Golden's zoning setback, size, and height rules, reviewed through a Planning Miscellaneous Structure Application. Confirm the size threshold and zoning setbacks for your lot with the Golden Building Division and Planning Department. A shed that will have electricity, plumbing, or a permanent foundation falls outside the usual small accessory building exemption, which generally covers simple unpowered structures only. Electrical and plumbing work each normally require their own permit and inspection even when the structure itself would have been exempt, and many jurisdictions require a licensed electrician or plumber to pull them. Zoning setbacks, height limits, and lot coverage are reviewed separately from the building permit, so confirm placement with your local department before the shed is delivered or poured. Colorado sets shed rules locally rather than through one statewide threshold, so the 200 square foot figure from the model International Residential Code does not govern here. Every Colorado jurisdiction we have checked uses 120 square feet instead: Aurora exempts a one-story detached shed or playhouse of 120 square feet or less, Arvada requires a permit above 120, and Wheat Ridge requires one above 120. In parts of Colorado a single regional building department serves a county and several cities at once, so confirm which office covers your address before you rely on any threshold. A building-permit exemption does not waive zoning setbacks or HOA rules, and running power to the shed still requires an electrical permit.
Who issues the permit in Golden?
The local building department for Golden handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.