Do I need a permit for shed or accessory structure in Unincorporated Natrona County?
It depends. Whether shed or accessory structure needs a permit in Unincorporated Natrona County comes down to the details of your project.
The model IRC exempts a one-story detached accessory structure of 200 square feet or less from a building permit (R105.2), but Wyoming has not adopted the IRC statewide, so that list applies only where your city or county enforces the IRC. Where a county zoning resolution applies, locating or erecting any building, including a shed, without a county zoning certificate is unlawful (W.S. 18-5-203). Wiring a shed while it is being built, or any wiring work that needs the utility to disconnect and restore power, requires an electrical wiring permit from the state or the local electrical program (W.S. 35-9-120(e)).
Get the answer for your exact project
Answer a few questions to see the permits, documents and inspections that may apply in Unincorporated Natrona County.
Local detail for Unincorporated Natrona County: The Natrona County Building Department issues building permits for the unincorporated county. The county FAQ says it 'has adopted the International Code Council (ICC) building codes for structures being built in the unincorporated areas of the county', and a zoning certificate is required for sheds. Inside Casper and the other incorporated towns, check with the town.
Documents you may need
- Building or zoning permit from the city or county, where requiredLikely required
- Site plan showing setbacks and easementsLikely required
- Electrical wiring permit if power is run to the shedSometimes required
Possible inspections
- Foundation or anchoring inspection where required
- Electrical inspection if the shed is wired
- Final or zoning inspection
Frequently asked questions
- Do I need a permit for shed or accessory structure in Unincorporated Natrona County?
- It depends. Whether shed or accessory structure needs a permit in Unincorporated Natrona County comes down to the details of your project. The documents and inspections sections on this page list what the building department typically asks for.
- Who issues the permit in Unincorporated Natrona County?
- The local building department for Unincorporated Natrona County handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
- How do I find out the exact requirements for my project?
- Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.
PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.