Skip to content
PermitRoadmap

Do I need a permit for addition or structural alteration in Pinellas Park?

Permit required

Yes. In Florida, addition or structural alteration generally requires a permit, and Pinellas Park is no exception.

A building permit is required for any addition and for structural alterations such as removing or altering load-bearing walls, changing the footprint, or altering the roof structure. The Florida Building Code only exempts ordinary minor repairs that do not cut into walls or remove load-bearing supports, so structural work is never exempt. Additions usually trigger zoning review and, in flood areas, elevation requirements.

Florida and local notes for Pinellas Park

Structural work is specifically excluded from the HB 803 $7,500 exemption. Signed and sealed engineered plans are commonly required. Additions often trigger setback, lot-coverage, and floodplain review. Pinellas County's own permitting office is the Building and Development Review Services Department, reachable on (727) 464-3888 at https://pinellas.gov/applying-for-a-building-permit/. Its online permit portal is https://aca-prod.accela.com/pinellas/default.aspx. It issues permits for the unincorporated county. If your city does not run its own building department, this is the office that will handle the job. Contractor licensing here is countywide, which is unusual. The Pinellas County Construction Licensing Board, established in 1973, regulates construction and home improvement contractors practicing in Pinellas County including all local municipalities, so whoever you hire needs to be licensed through it no matter which city you are in. Reach it on (727) 582-3100 or pcclb@pinellas.gov, 440 Court St, 1st Floor, Clearwater. State legislation has been changing which specialty trades are licensed locally rather than by the state, so confirm the current license type your trade needs before signing a contract. Pinellas Park's Single Family Home/Addition procedures require drawings sealed by an architect or engineer, a Landscape Application, and a Notice of Commencement for work over $2,500, and the city reviews setbacks and landscape codes along with building code. No tie beam or lintel inspection is made without a survey showing finished floor elevations and setback measurements on site, and a final survey is required with the final inspection. Under Sec. 18-912, an addition may match a lawfully existing finished floor elevation that is below the city's standard (24 inches above the highest abutting street centerline), but property in a Special Flood Hazard Area must also meet flood requirements. New bedroom additions may owe Parkland and Library Dedication fees in addition to permit fees, according to the city's residential fee estimate sheet.

Documents you may need

  • Permit applicationLikely required
  • Signed and sealed construction and structural plansLikely required
  • Site plan or surveyLikely required
  • Florida Energy Code forms for conditioned spaceSometimes required
  • Notice of commencementSometimes required
  • Contractor license number issued or recognised by the countyLikely required
  • City of Pinellas Park building permit application with mechanical, electrical, plumbing or gas informationLikely required
  • Site plan or survey showing setbacks, existing trees and trees to be removed, and proposed elevationLikely required
  • Architectural drawings sealed by an architect or engineerLikely required
  • Landscape ApplicationLikely required
  • Energy calculations, and electrical load calculations for additions of 500 square feet or moreSometimes required
  • Engineering permit when the addition involves a driveway, drainage change, public sidewalk, water and sewer, or siteworkSometimes required

Possible inspections

  • Footing and foundation inspection
  • Framing inspection, with rough electrical, plumbing, and mechanical
  • Insulation inspection
  • Final inspection
  • Footing inspection
  • Slab inspection
  • Tie beam or lintel inspection with survey on site
  • Framing inspection
  • Rough trade inspections
  • Final inspection with final survey

Frequently asked questions

Do I need a permit for addition or structural alteration in Pinellas Park?
Yes. In Florida, addition or structural alteration generally requires a permit, and Pinellas Park is no exception. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Pinellas Park?
The local building department for Pinellas Park handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.