Skip to content
PermitRoadmap

Do I need a permit for addition or structural alteration in Plantation?

Permit required

Yes. In Florida, addition or structural alteration generally requires a permit, and Plantation is no exception.

A building permit is required for any addition and for structural alterations such as removing or altering load-bearing walls, changing the footprint, or altering the roof structure. The Florida Building Code only exempts ordinary minor repairs that do not cut into walls or remove load-bearing supports, so structural work is never exempt. Additions usually trigger zoning review and, in flood areas, elevation requirements.

Florida and local notes for Plantation

Structural work is specifically excluded from the HB 803 $7,500 exemption. Signed and sealed engineered plans are commonly required. Additions often trigger setback, lot-coverage, and floodplain review. An addition is designed to full HVHZ structural standards, which normally means signed and sealed engineering and a longer plan review than elsewhere in Florida. Your city issues the permit, not the county. Broward's 31 municipal building departments each run their own permitting and inspections, while the county Board of Rules and Appeals sets code interpretation and the countywide amendments they all work from. The Broward County Amendments to the Florida Building Code, published by the Board of Rules and Appeals under the county charter, apply on top of the state code everywhere in the county. Individual cities can add their own amendments as well, so confirm both. Plantation's plan requirements call for NAVD elevations of the top of all first floors on the plans and application, and drainage district approval where applicable. Under Plantation Code 27-310(b)(3), accessory buildings may not exceed the house height by more than 20 percent or 25 feet, and their combined floor area is capped at the greater of 35 percent of the home's gross floor area or 1,500 square feet. Construction hours are 7 AM to 8 PM Monday through Saturday, with no work on Sundays or holidays under Code 16-2.

Documents you may need

  • Permit applicationLikely required
  • Signed and sealed construction and structural plansLikely required
  • Site plan or surveyLikely required
  • Florida Energy Code forms for conditioned spaceSometimes required
  • Notice of commencementSometimes required
  • Product approval or Notice of Acceptance documentation for HVHZ rated materialsSometimes required
  • Broward County Uniform Building Permit Application, with all subcontractor applications in one packageLikely required
  • Signed and sealed plans, survey, and plot planLikely required
  • Energy calculationsLikely required
  • Drainage district approval where applicable (Old Plantation Water Control District or Plantation Acres Improvement District)Sometimes required

Possible inspections

  • Footing and foundation inspection
  • Framing inspection, with rough electrical, plumbing, and mechanical
  • Insulation inspection
  • Final inspection
  • Foundation inspection
  • Framing inspection
  • Rough trade inspections

Frequently asked questions

Do I need a permit for addition or structural alteration in Plantation?
Yes. In Florida, addition or structural alteration generally requires a permit, and Plantation is no exception. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Plantation?
The local building department for Plantation handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.