Skip to content
PermitRoadmap

Do I need a permit for accessory dwelling unit (adu) in Cheyenne?

Permit likely required

Most likely yes. Accessory dwelling unit (adu) usually requires a permit in Wyoming. Confirm the specifics with Cheyenne.

Wyoming has no statewide accessory dwelling unit law that we found; cities, towns and counties decide whether a second unit is allowed through zoning (W.S. 15-1-601, 18-5-201). Installing electrical equipment in a building under construction requires an electrical wiring permit, and the utility may not energize the service until the permit is obtained (W.S. 35-9-120(e)). No person may construct, install or modify a sewerage or disposal system without a permit, so connecting a unit to a septic system needs a small wastewater permit to construct (W.S. 35-11-301(a)(iii)). DEQ issues small wastewater permits in Carbon, Niobrara, Platte and Weston counties, and delegated counties or cities issue them elsewhere (DEQ Small Wastewater Systems page).

Get the answer for your exact project

Answer a few questions to see the permits, documents and inspections that may apply in Cheyenne.

Check my project

Documents you may need

  • Zoning approval from the city or countyLikely required
  • Building permit from the city or county, where it enforces a building codeLikely required
  • Electrical wiring permit for the unitRequired
  • Small wastewater permit to construct if the unit uses or enlarges a septic systemSometimes required
  • Construction drawings and a site planLikely required

Possible inspections

  • Footing, framing and final inspections where a building permit applies
  • Electrical rough and final inspection
  • Septic inspection by DEQ or the delegated local program

Frequently asked questions

Do I need a permit for accessory dwelling unit (adu) in Cheyenne?
Most likely yes. Accessory dwelling unit (adu) usually requires a permit in Wyoming. Confirm the specifics with Cheyenne. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Cheyenne?
The local building department for Cheyenne handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.