Building permits in Unincorporated Goshen County
Unincorporated Goshen County does not issue residential building permits. Goshen County does not issue building permits. Its Planning and GIS page states: 'Currently Goshen County does not have Zoning Regulations or Building Inspections.' The county handles subdivisions and family exemptions. Electrical work and some other work may still need state permits, and Torrington and the other towns run their own permit offices.
That does not make the work unregulated. The construction standard still applies, trade licensing still applies, and separate approvals such as on-site sewage, floodplain development, and driveway access are handled by other offices. Below are the contact details for the office to ask, plus guides for the projects homeowners ask about most.
Wyoming does not have a statewide residential building code. Cities and towns may adopt building, plumbing and electrical codes, and a city or county can take over code enforcement from the state, so building permits for Unincorporated Goshen County come from the city, town or county that covers the property, if it has adopted a code. In some rural areas there is no local building permit for a home. A few rules apply everywhere, though: electrical work must meet the National Electrical Code, and wiring a building under construction or a remodel that needs the utility to disconnect and restore power requires an electrical wiring permit from the state or the local electrical program. A septic system cannot be installed or changed without a permit to construct, a county zoning certificate is required to build or enlarge where a county zoning resolution applies, and you must notify the one-call center at least 2 full business days before digging. Wyoming has no statewide dollar or size threshold that exempts a project from a permit, so confirm requirements with the office that covers Unincorporated Goshen County before you begin.
Permit guides for Unincorporated Goshen County
Permit FAQs for Unincorporated Goshen County
- Do I need a building permit in Unincorporated Goshen County?
- Goshen County does not issue building permits. Its Planning and GIS page states: 'Currently Goshen County does not have Zoning Regulations or Building Inspections.' The county handles subdivisions and family exemptions. Electrical work and some other work may still need state permits, and Torrington and the other towns run their own permit offices.
- Who issues building permits in Unincorporated Goshen County?
- Nobody does. Unincorporated Goshen County does not run a residential building permit program, which is why this page lists Planning and GIS as the office to contact rather than as a permit issuer. Your mailing city is not always the authority over your property, so confirm which jurisdiction you are actually in before assuming this applies to you.
- What still applies in Unincorporated Goshen County if there is no building permit?
- The construction standard does. Work must still meet the building code adopted and enforced by the city, town or county, since Wyoming has no statewide residential building code (cities and towns may adopt codes under W.S. 15-1-119 and may take over enforcement from the state under W.S. 35-9-121), while the National Electrical Code and the state electrical wiring permit law apply statewide, and trade licensing rules apply regardless of whether a permit is issued. Separate approvals such as on-site sewage, floodplain development, and driveway access to a public road are handled by other offices and are unaffected. Ask Planning and GIS which of those reach your property before you start.
PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.