Do I need a permit for solar panel installation in Forest Hills?

Permit required

Yes. In Tennessee, solar panel installation generally requires a permit, and Forest Hills is no exception.

Rooftop solar typically needs both structural (building) and electrical review; utility interconnection approval is a separate process from the local permit. Requirements vary by jurisdiction, so verify submittal details with your local codes department (Nashville, Memphis/Shelby, Knox) or the state issuing agent before installation. Forest Hills treats roof alteration as permit work and issues the building permit itself, but the electrical portion of a solar install is a trade item; the City states that all trade inspections including electrical are conducted by Metro Nashville, so plan for both a City building permit and a Metro Nashville electrical permit. The City Building Inspector completes the building inspections and does not accept third party verifications, and the system must meet the City adopted 2018 International Residential Code and the electrical code. Tennessee requires a state contractor license for larger residential work, so confirm your installer holds the correct Tennessee classification and monetary limit before signing.

Documents you may need

  • Building/electrical permit applicationrequired
  • Site plan and roof/array layoutrequired
  • Electrical line diagram and equipment specifications (modules, inverter)required
  • Structural documentation showing the roof can carry the added loadLikely required
  • City of Forest Hills building permit application through the City Permit Database for the rooftop array and its structural mountingrequired
  • Applicable Application Guide Sheet with the array layout, mounting details, and equipment specificationsLikely required
  • Metro Nashville electrical permit for the photovoltaic system, inverter, and interconnection, since Metro Nashville conducts the electrical trade inspection in Forest HillsLikely required

Possible inspections

  • Rough electrical / mounting inspection
  • Final electrical and building inspection
  • Structural and building inspection of the array mounting by the City of Forest Hills Building Inspector
  • Electrical trade inspection conducted by Metro Nashville
  • Final inspection, with utility interconnection coordinated separately

Frequently asked questions

Do I need a permit for solar panel installation in Forest Hills?
Yes. In Tennessee, solar panel installation generally requires a permit, and Forest Hills is no exception. Rooftop solar typically needs both structural (building) and electrical review; utility interconnection approval is a separate process from the local permit. Requirements vary by jurisdiction, so verify submittal details with your local codes department (Nashville, Memphis/Shelby, Knox) or the state issuing agent before installation. Forest Hills treats roof alteration as permit work and issues the building permit itself, but the electrical portion of a solar install is a trade item; the City states that all trade inspections including electrical are conducted by Metro Nashville, so plan for both a City building permit and a Metro Nashville electrical permit. The City Building Inspector completes the building inspections and does not accept third party verifications, and the system must meet the City adopted 2018 International Residential Code and the electrical code. Tennessee requires a state contractor license for larger residential work, so confirm your installer holds the correct Tennessee classification and monetary limit before signing.
Who issues the permit in Forest Hills?
The local building department for Forest Hills handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.