Skip to content
PermitRoadmap

Do I need a permit for electrical panel or service upgrade in Myrtle Beach?

Permit required

Yes. In South Carolina, electrical panel or service upgrade generally requires a permit, and Myrtle Beach is no exception.

A service or panel upgrade requires the utility to disconnect and reconnect power, so the inspection and the utility visit have to be coordinated. Plan for a short outage. Grounding and bonding are the most common failure points on a panel change. Make sure the ground rods and bonding are done to code before the inspection. Myrtle Beach permits are handled by the City of Myrtle Beach Construction Services and Buildings, reachable on 843-918-1111 at https://www.cityofmyrtlebeach.com/departments/construction_services/index.php. Horry County runs its own building permit office as well, so confirm whether Myrtle Beach or the county handles your address before you apply. A service change needs the inspection to clear before the utility resets the meter, so schedule it before the changeover day.

Documents you may need

  • Electrical permit applicationrequired
  • Licensed electrical contractor information or owner-builder affidavitrequired
  • Panel and service load details (amperage and equipment)Likely required

Possible inspections

  • Rough or panel inspection of the new service equipment, grounding and bonding
  • Final inspection, coordinated with the utility for disconnect and reconnect

Frequently asked questions

Do I need a permit for electrical panel or service upgrade in Myrtle Beach?
Yes. In South Carolina, electrical panel or service upgrade generally requires a permit, and Myrtle Beach is no exception. A service or panel upgrade requires the utility to disconnect and reconnect power, so the inspection and the utility visit have to be coordinated. Plan for a short outage. Grounding and bonding are the most common failure points on a panel change. Make sure the ground rods and bonding are done to code before the inspection. Myrtle Beach permits are handled by the City of Myrtle Beach Construction Services and Buildings, reachable on 843-918-1111 at https://www.cityofmyrtlebeach.com/departments/construction_services/index.php. Horry County runs its own building permit office as well, so confirm whether Myrtle Beach or the county handles your address before you apply. A service change needs the inspection to clear before the utility resets the meter, so schedule it before the changeover day.
Who issues the permit in Myrtle Beach?
The local building department for Myrtle Beach handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.