Do I need a permit for accessory dwelling unit (adu) in Keizer?
Keizer does not issue residential building permits. Keizer does not run its own building program. The Oregon Building Codes Division Local Building Department Directory lists Marion County as the building department for Keizer for all permit types (structural, mechanical, electrical, plumbing). The City of Keizer Building Permit Division takes applications at City Hall for single family homes, residential remodels and accessory structures on Marion County permit forms; Marion County Building Inspection (5155 Silverton Rd NE, Salem, 503-588-5147) handles plumbing with plan review, septic, deferred submittals, re-inspections and electrical with plan review.
The requirements below come from Oregon rules and describe the standard the work must still meet. They are not a statement that Keizer will issue you a permit.
Yes. In Oregon, accessory dwelling unit (adu) generally requires a permit, and Keizer is no exception.
Oregon cities over 2,500 people and counties over 15,000 must allow at least one accessory dwelling unit for each detached single-unit dwelling in areas inside the urban growth boundary zoned for detached single-unit dwellings, subject to reasonable siting and design rules; they may not require owner occupancy or extra off-street parking (ORS 197A.425, formerly ORS 197.312). Under Oregon's middle housing law (ORS 197A.420, formerly ORS 197.758), larger cities and Metro-area cities must allow duplexes through cottage clusters on residential lots, and cities of 2,500 to 25,000 outside Metro must allow duplexes. These laws change zoning only; an ADU is a new dwelling and always needs a building permit plus electrical, plumbing, and mechanical permits (ORSC R105.1 and R105.1.1).
Get your exact answer
Answer a few questions to see the specific permits, documents, and next steps for your accessory dwelling unit (adu) in Keizer.
Check my projectDocuments you may need
- Local land-use or zoning approval for the ADULikely required
- Building permit applicationRequired
- Site plan with setbacks, utilities, and accessRequired
- Construction drawings and ORSC Chapter 11 energy complianceRequired
- Separate electrical, plumbing, and mechanical permitsRequired
Possible inspections
- Footing and foundation inspection
- Framing and rough-in electrical, plumbing, and mechanical inspections
- Insulation inspection
- Final inspection before occupancy
Frequently asked questions
- Do I need a permit for accessory dwelling unit (adu) in Keizer?
- Yes. In Oregon, accessory dwelling unit (adu) generally requires a permit, and Keizer is no exception. The documents and inspections sections on this page list what the building department typically asks for.
- Who issues the permit in Keizer?
- The local building department for Keizer handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
- How do I find out the exact requirements for my project?
- Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.