Skip to content
PermitRoadmap

Do I need a permit for solar panel installation in Winston-Salem?

Permit required

Yes. In North Carolina, solar panel installation generally requires a permit, and Winston-Salem is no exception.

A rooftop or ground-mounted PV system involves both structural and electrical work, so it is never covered by the NCGS 160D-1110 minor-work exemption and requires a permit. Interconnection with the utility is a separate approval from your building permit; both must be completed before the system is energized. Permits and inspections here run through the Winston-Salem/Forsyth County Inspections Division, a joint city and county office in the Planning and Development Services Department, so you are not bounced between a city desk and a county desk the way you are in most North Carolina metros. Applications, inspections, and licences go through the city's map-based BuildIT portal. The Inspections Division is at the Bryce A. Stuart Municipal Building, 100 E First Street, 336-727-2624, askinspect@cityofws.org. Solar adds electrical work and loads the roof structure, both express exceptions to the North Carolina $40,000 exemption, so permits are required regardless of project cost. The electrical permit is separate from the building permit, and the utility interconnection runs outside the permit process. Forsyth County's own permitting office is the Forsyth County Inspections Division, reachable on 336-727-2624 at https://www.cityofws.org/343/Inspections-Division. Its online permit portal is https://buildit.cityofws.org/wsfcpermit. It issues permits for the unincorporated county. If your city does not run its own building department, this is the office that will handle the job, and that is more common in North Carolina than most states: the county is often the building authority even inside city limits, with the city handling only zoning. Solar involves a building permit for the attachment and a separate electrical permit, plus a utility interconnection that runs outside the permit process.

Documents you may need

  • Building / electrical permit applicationrequired
  • Site plan and roof / array layoutrequired
  • Structural documentation (roof load / attachment)Likely required
  • Electrical line diagram and equipment specsrequired
  • Building permit applicationLikely required
  • Electrical permit applicationLikely required
  • Structural attachment and array layout detailsLikely required
  • Utility interconnection agreementSometimes required

Possible inspections

  • Mounting / structural attachment inspection
  • Electrical rough and final inspection
  • Final inspection (with utility interconnection sign-off)
  • Rough electrical inspection
  • Structural attachment inspection
  • Final inspection

Frequently asked questions

Do I need a permit for solar panel installation in Winston-Salem?
Yes. In North Carolina, solar panel installation generally requires a permit, and Winston-Salem is no exception. A rooftop or ground-mounted PV system involves both structural and electrical work, so it is never covered by the NCGS 160D-1110 minor-work exemption and requires a permit. Interconnection with the utility is a separate approval from your building permit; both must be completed before the system is energized. Permits and inspections here run through the Winston-Salem/Forsyth County Inspections Division, a joint city and county office in the Planning and Development Services Department, so you are not bounced between a city desk and a county desk the way you are in most North Carolina metros. Applications, inspections, and licences go through the city's map-based BuildIT portal. The Inspections Division is at the Bryce A. Stuart Municipal Building, 100 E First Street, 336-727-2624, askinspect@cityofws.org. Solar adds electrical work and loads the roof structure, both express exceptions to the North Carolina $40,000 exemption, so permits are required regardless of project cost. The electrical permit is separate from the building permit, and the utility interconnection runs outside the permit process. Forsyth County's own permitting office is the Forsyth County Inspections Division, reachable on 336-727-2624 at https://www.cityofws.org/343/Inspections-Division. Its online permit portal is https://buildit.cityofws.org/wsfcpermit. It issues permits for the unincorporated county. If your city does not run its own building department, this is the office that will handle the job, and that is more common in North Carolina than most states: the county is often the building authority even inside city limits, with the city handling only zoning. Solar involves a building permit for the attachment and a separate electrical permit, plus a utility interconnection that runs outside the permit process.
Who issues the permit in Winston-Salem?
The local building department for Winston-Salem handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.