Do I need a permit for ev charger installation in Anaconda-Deer Lodge County?

Permit required

Yes. In Montana, ev charger installation generally requires a permit, and Anaconda-Deer Lodge County is no exception.

An electrical permit is required for any electrical installation in construction, remodeling or repair, issued by the state Building Codes Program or by a city, county or town certified to enforce the electrical code (ARM 24.301.431, MCA 50-60-604). A homeowner may wire their own home, garage and premises on a state homeowner electrical permit only if the property is for personal use and not built for resale or as a rental; all other wiring needs a permit pulled by a Montana licensed electrical contractor (ARM 24.301.431(3), Building Codes Program Electrical Permits page). A power supplier may not connect or energize an electrical installation until the owner or a licensed electrical contractor delivers an electrical permit covering it (MCA 50-60-605).

Get the answer for your exact project

Answer a few questions to see the permits, documents and inspections that may apply in Anaconda-Deer Lodge County.

Check my project

Local detail for Anaconda-Deer Lodge County: Anaconda-Deer Lodge County is a consolidated city-county government. Its Planning Department publishes a residential building permit application (revised September 2026, with a plan review fee, and contractors must hold a county business license) and lists a Building Inspector, so apply there before building. Anaconda-Deer Lodge County does not appear on the state Building Codes Program list of certified jurisdictions (updated October 7, 2026), so state electrical and plumbing permits from the Building Codes Bureau may also apply; confirm with both offices.

Documents you may need

  • Electrical permit from the state Building Codes Program, or from the certified local electrical programRequired
  • Licensed electrical contractor, or a state homeowner electrical permit for your own home kept for personal useRequired
  • Charger specifications and circuit sizeLikely required
  • Load calculation or service upgrade details if the panel is changedSometimes required

Possible inspections

  • Electrical rough-in inspection before conduit or wiring is covered
  • Final electrical inspection

Frequently asked questions

Do I need a permit for ev charger installation in Anaconda-Deer Lodge County?
Yes. In Montana, ev charger installation generally requires a permit, and Anaconda-Deer Lodge County is no exception. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Anaconda-Deer Lodge County?
The local building department for Anaconda-Deer Lodge County handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.