Do I need a permit for ev charger installation in Unincorporated Union County?
We have not yet confirmed which office issues building permits in Unincorporated Union County. Ask the Union County Judge/Executive's Office who handles permits for your address before you start.
The requirements below come from Kentucky rules. They are not a statement that Unincorporated Union County issues or does not issue permits.
Yes. In Kentucky, ev charger installation generally requires a permit, and Unincorporated Union County is no exception.
State law requires a permit before any construction, alteration, or repair of an electrical system (KRS 227.480(1)), so a new 240-volt circuit, outlet, or hardwired charger needs an electrical permit whether or not the city or county has a building program. The permit and inspection come from the local certified electrical inspector, or from the Department of Housing, Buildings and Construction where the local government has not provided one (815 KAR 35:020, Section 1); where the Department inspects, the fee for work valued under $8,000 is $125 (Section 5). A homeowner may do electrical work on their own premises without a license, but the permit and inspection still apply (KRS 227.480(2)(a)). Plugging portable equipment into an existing permanently installed receptacle is exempt from a permit (KRC Section R105.2, Electrical item 5); adding the receptacle or circuit is not.
Get your exact answer
Answer a few questions to see the specific permits, documents, and next steps for your ev charger installation in Unincorporated Union County.
Check my projectDocuments you may need
- Electrical permit application (state Form EL-13 where the Department of Housing, Buildings and Construction has jurisdiction, or the local electrical inspector's form)Required
- Kentucky electrical contractor license, unless a homeowner is doing the work on their own premises (KRS 227.480(2))Likely required
- Complete value of the electrical work, labor and materials, for the inspection fee (815 KAR 35:020, Section 2(3))Required
- Load calculation or panel capacity check for the new circuitVerification needed
- Charger manufacturer specifications and installation instructionsRecommended
Possible inspections
- Electrical rough-in inspection if any wiring will be covered or concealed (815 KAR 35:020, Section 3(5))
- Electrical final inspection before the charger is used (815 KAR 35:020, Section 3(7))
Frequently asked questions
- Do I need a permit for ev charger installation in Unincorporated Union County?
- Yes. In Kentucky, ev charger installation generally requires a permit, and Unincorporated Union County is no exception. The documents and inspections sections on this page list what the building department typically asks for.
- Who issues the permit in Unincorporated Union County?
- We have not yet confirmed which office issues building permits in Unincorporated Union County, or whether one does. Ask the Union County Judge/Executive's Office, which is the county's main government office, who handles permits for your address. Your mailing city is not always the permitting authority.
- How do I find out the exact requirements for my project?
- Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.