Do I need a permit for ev charger installation in Lake Wales?

Permit likely required

Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Lake Wales.

Installing an EV charger on a new 240-volt circuit is electrical work, and the Florida Building Code lists no electrical work as exempt from a permit. Electrical work is also excluded from the $7,500 permit exemption. Your city or county building department issues the electrical permit and inspects it, and an owner may act as their own electrical contractor only on a home they occupy and do not offer for sale or lease.

Get the answer for your exact project

Answer a few questions to see the permits, documents and inspections that may apply in Lake Wales.

Check my project

Florida rules to know for ev charger installation

Section 105.1 of the Florida Building Code, Building requires a permit to install or alter an electrical system, and section 105.2 lists no electrical work as exempt. Electrical work is specifically excluded from the $7,500 permit exemption in Florida Statutes 553.79(1)(g). Florida has no statewide electrical permit office. Your city or county building department issues the electrical permit and inspects the work. An owner may act as their own electrical contractor on a single-family or duplex home they occupy and do not offer for sale or lease, under Florida Statutes 489.503(6).

Documents you may need

  • Electrical permit applicationLikely required
  • Service load calculation showing panel capacity for the new circuitLikely required
  • Charger specification sheet and installation instructionsSometimes required
  • Licensed electrical contractor information or owner-builder disclosure statementLikely required

Possible inspections

  • Rough electrical inspection if wiring is concealed in walls
  • Final electrical inspection

Fees and forms for ev charger installation in Lake Wales

What the permit costs

  • Building permit (including buildings, roofs, signs and other structures), total valuation $1,000.00 to $100,000.00: $65.03 for the first $1,000.00 plus $8.49 for each additional thousand or fraction thereof, to and including $100,000.00. Source
  • Building permit, total valuation $1,000.00 and less: inspection only fee of $65.03 per inspection. Source
  • Certificate of Occupancy, residential: $49.57. Source
  • Penalty fee for starting work without a permit (second and each subsequent violation): 100% of the usual permit fee or $243.98, whichever is greater, in addition to the normally required permit fee. Source
Article IX, Schedule of Fees (Prepared for October 1, 2026) (effective 2026-10-01)

Copied from Lake Wales's official pages on 2026-11-15. Fees change, so confirm the amount with the permit office before you apply.

Frequently asked questions

Do I need a permit for ev charger installation in Lake Wales?
Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Lake Wales. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Lake Wales?
The local building department for Lake Wales handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.