Skip to content
PermitRoadmap

Do I need a permit for ev charger installation in Unincorporated Pasco County?

Permit likely required

Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Unincorporated Pasco County.

Installing an EV charger on a new 240-volt circuit is electrical work, and the Florida Building Code lists no electrical work as exempt from a permit. Electrical work is also excluded from the $7,500 permit exemption. Your city or county building department issues the electrical permit and inspects it, and an owner may act as their own electrical contractor only on a home they occupy and do not offer for sale or lease.

Get the answer for your exact project

Answer a few questions to see the permits, documents and inspections that may apply in Unincorporated Pasco County.

Check my project

Local detail for Unincorporated Pasco County: Online portal is PascoGateway (Accela). Additional central permitting office at 14236 6th Street, Suite 203, Dade City, FL 33523; Land O' Lakes office (4111 Land O' Lakes Blvd, Suite 108) by appointment only.

Florida rules to know for ev charger installation

Section 105.1 of the Florida Building Code, Building requires a permit to install or alter an electrical system, and section 105.2 lists no electrical work as exempt. Electrical work is specifically excluded from the $7,500 permit exemption in Florida Statutes 553.79(1)(g). Florida has no statewide electrical permit office. Your city or county building department issues the electrical permit and inspects the work. An owner may act as their own electrical contractor on a single-family or duplex home they occupy and do not offer for sale or lease, under Florida Statutes 489.503(6).

Documents you may need

  • Electrical permit applicationLikely required
  • Service load calculation showing panel capacity for the new circuitLikely required
  • Charger specification sheet and installation instructionsSometimes required
  • Licensed electrical contractor information or owner-builder disclosure statementLikely required

Possible inspections

  • Rough electrical inspection if wiring is concealed in walls
  • Final electrical inspection

Fees and forms for ev charger installation in Unincorporated Pasco County

What the permit costs

  • All permits, categories within permits, and trades of work identified on a permit will be charged a Base Fee of Forty-Five and 00/100 Dollars ($45.00), plus any additional fees identified in the following list. Source
Building Construction Services Fees (Resolution 26-0249, Schedule of Fees for the Central Permitting and Building Inspections Divisions, resolved July 14, 2026) (effective 2026-07-01)

Copied from Unincorporated Pasco County's official pages on 2026-11-15. Fees change, so confirm the amount with the permit office before you apply.

Frequently asked questions

Do I need a permit for ev charger installation in Unincorporated Pasco County?
Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Unincorporated Pasco County. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Unincorporated Pasco County?
The local building department for Unincorporated Pasco County handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.