Do I need a permit for bathroom remodel in Greenacres?
It depends. Whether bathroom remodel needs a permit in Greenacres comes down to the details of your project.
Whether a Florida bathroom remodel needs a permit depends on the work. The Florida Building Code exempts only small plumbing repairs such as clearing a stoppage or resetting a toilet with no pipes replaced, so moving or replacing pipe, adding a shower, or changing wiring needs a permit. The $7,500 exemption never covers electrical, plumbing, structural, mechanical or gas work, and a project may not be split to stay under it.
Get the answer for your exact project
Answer a few questions to see the permits, documents and inspections that may apply in Greenacres.
Florida rules to know for bathroom remodel
Section 105.2 of the Florida Building Code, Building exempts only stopping leaks, clearing stoppages, and removing and reinstalling a toilet where no valves, pipes or fixtures are replaced or rearranged. Moving or replacing pipe is new work that needs a plumbing permit. The $7,500 exemption in Florida Statutes 553.79(1)(g) never covers electrical, plumbing, structural, mechanical or gas work, does not apply in a flood hazard area, and needs a written request with the contract. A project may not be split into smaller jobs to stay under $7,500.
Documents you may need
- Building permit application (for wall, framing or layout changes)Sometimes required
- Plumbing permit and scope or riser diagram (for pipe, valve or fixture changes)Sometimes required
- Electrical and mechanical permits (new circuits, exhaust fan)Sometimes required
- Written exemption request with contract, if claiming the $7,500 exemptionSometimes required
- Licensed contractor information or owner-builder disclosure statementSometimes required
Possible inspections
- Rough plumbing inspection
- Rough electrical inspection
- Framing inspection if walls are altered
- Final inspection
Fees and forms for bathroom remodel in Greenacres
What the permit costs
- Non-refundable application fee due when a permit application is submitted: $75 (applied toward the total permit fee due at issuance). Source
- Building permit fees by construction value: $0 to $100,000, 2.5% (minimum fee $75); $100,001 to $300,000, add 2%; all values over $300,000, add 1.25%. Source
- Sub permit with value included in the total construction value and no independent review: $30. Source
- Work without a permit: 4X the permit fee plus $100 for a 1st time offense, $200 for a 2nd, and $500 for a 3rd or more. Source
- Re-inspection fees: $50 for the 1st re-inspection, $100 for the 2nd of the same type, and $200 for the 3rd and subsequent of the same type. Source
- Permit extension before the permit expires: $50 for the 1st extension (90 days) and $25 for the 2nd extension (90 days), maximum 2. Source
- Renewal of an expired permit: 50% of the permit fee if one year or less, 100% if over one year. Source
- Certificate of Completion for permits with construction value of less than $5,000: $25. Source
Copied from Greenacres's official pages on 2026-11-12. Fees change, so confirm the amount with the permit office before you apply.
Frequently asked questions
- Do I need a permit for bathroom remodel in Greenacres?
- It depends. Whether bathroom remodel needs a permit in Greenacres comes down to the details of your project. The documents and inspections sections on this page list what the building department typically asks for.
- Who issues the permit in Greenacres?
- The local building department for Greenacres handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
- How do I find out the exact requirements for my project?
- Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.
PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.