Do I need a permit for kitchen remodel in Mary Esther?

Permit may be required

It depends. Whether kitchen remodel needs a permit in Mary Esther comes down to the details of your project.

A Florida kitchen remodel needs a permit for any new or altered electrical, gas, mechanical or plumbing work, since the Florida Building Code lists none of that as exempt. Cabinets and counters with no trade work may qualify for the $7,500 exemption, which requires a written request with the contract and does not apply in a flood hazard area. Local departments set their own policy for cabinet and countertop work above that amount.

Get the answer for your exact project

Answer a few questions to see the permits, documents and inspections that may apply in Mary Esther.

Check my project

Local detail for Mary Esther: Since August 24, 2026 the City of Mary Esther issues its own building permits through its GovWell online portal; work that needs Florida Building Code review goes to the city's contracted building official (EPCI). Permits issued before that date followed the earlier Okaloosa County interlocal process.

Florida rules to know for kitchen remodel

Section 105.1 of the Florida Building Code, Building requires a permit for new or altered electrical, gas, mechanical or plumbing systems, and section 105.2 lists no electrical or gas-line work as exempt. The $7,500 exemption in Florida Statutes 553.79(1)(g) can cover non-trade work such as cabinets and counters, but not electrical, plumbing, structural, mechanical or gas work, and not in a flood hazard area. It requires a written request with the contract. A project may not be split into smaller jobs to stay under $7,500, and local departments set their own policy for cabinet and countertop work above that amount.

Documents you may need

  • Building permit application (for wall, framing or layout changes)Sometimes required
  • Electrical permit (new circuits or rewiring)Sometimes required
  • Plumbing or gas permit (moving the sink, adding a gas range line)Sometimes required
  • Beam detail or engineering for removing a load-bearing wallSometimes required
  • Written exemption request with contract, if claiming the $7,500 exemptionSometimes required

Possible inspections

  • Rough electrical, plumbing and gas inspections
  • Framing inspection if walls are altered
  • Final inspection

Fees and forms for kitchen remodel in Mary Esther

What the permit costs

  • Residential (one- and two-family) projects valued at $10,000 or less: $95 permit fee, plus $45 plan review. Source
  • Residential projects over $10,000: $95 plus $5.25 per $1,000 of value over $10,000, with rates stepping down for larger projects; plan review is $0.45 per $1,000 of total valuation ($45 minimum). Source
  • Re-inspections: $75 first, $150 second, $250 each additional. Source
  • Certificate of Occupancy: $40. Source
City of Mary Esther Permit Fees (Resolution 26-09), Permits & Inspections page

Copied from Mary Esther's official pages on 2026-11-15. Fees change, so confirm the amount with the permit office before you apply.

Frequently asked questions

Do I need a permit for kitchen remodel in Mary Esther?
It depends. Whether kitchen remodel needs a permit in Mary Esther comes down to the details of your project. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Mary Esther?
The local building department for Mary Esther handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.