Skip to content
PermitRoadmap

Do I need a permit for ev charger installation in Fort Lauderdale?

Permit likely required

Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Fort Lauderdale.

Installing an EV charger on a new 240-volt circuit is electrical work, and the Florida Building Code lists no electrical work as exempt from a permit. Electrical work is also excluded from the $7,500 permit exemption. Your city or county building department issues the electrical permit and inspects it, and an owner may act as their own electrical contractor only on a home they occupy and do not offer for sale or lease.

Get the answer for your exact project

Answer a few questions to see the permits, documents and inspections that may apply in Fort Lauderdale.

Check my project

Local detail for Fort Lauderdale: Online permitting via LauderBuild (Accela Citizen Access).

Florida rules to know for ev charger installation

Section 105.1 of the Florida Building Code, Building requires a permit to install or alter an electrical system, and section 105.2 lists no electrical work as exempt. Electrical work is specifically excluded from the $7,500 permit exemption in Florida Statutes 553.79(1)(g). Florida has no statewide electrical permit office. Your city or county building department issues the electrical permit and inspects the work. An owner may act as their own electrical contractor on a single-family or duplex home they occupy and do not offer for sale or lease, under Florida Statutes 489.503(6).

Documents you may need

  • Electrical permit applicationLikely required
  • Service load calculation showing panel capacity for the new circuitLikely required
  • Charger specification sheet and installation instructionsSometimes required
  • Licensed electrical contractor information or owner-builder disclosure statementLikely required

Possible inspections

  • Rough electrical inspection if wiring is concealed in walls
  • Final electrical inspection

Fees and forms for ev charger installation in Fort Lauderdale

What the permit costs

  • Master permit, stand-alone permit or trade permit: minimum $131 or 1.75% of construction cost. Source
  • Premium fee (Engineering, Landscaping and Zoning plan review and inspection): $93 or 0.12% of construction cost. Source
  • Permit by affidavit (private provider completes inspection) for project costs $25,000 and below: $105 base fee. Source
  • Plan revision: $105 per hour or $26.25 per 15-minute increment. Source
  • Reinspection: $164. Source
  • Change of contractor: $105. Source
  • Permit renewal: 50% of total permit fee if requested before the permit expiration date, 100% of total permit fee if requested after it. Source
  • Surcharges: State of Florida DBPR 1% of total permit fees assessed or minimum $2, Building Code Administrators and Inspectors Fund (BCAI) 1.5% of total permit fees assessed or minimum $2, Construction Lien Law $5, and Board of Rules and Appeals $0.52 per $1000 of construction cost or minimum $2. Source
Development Services Department, Building Services: Building Permit Fees (Rev 10, Revision Date 9/17/2026, approved by John Travers, Building Official)

Copied from Fort Lauderdale's official pages on 2026-11-12. Fees change, so confirm the amount with the permit office before you apply.

Frequently asked questions

Do I need a permit for ev charger installation in Fort Lauderdale?
Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Fort Lauderdale. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Fort Lauderdale?
The local building department for Fort Lauderdale handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.