Do I need a permit for ev charger installation in Titusville?
Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Titusville.
Installing an EV charger on a new 240-volt circuit is electrical work, and the Florida Building Code lists no electrical work as exempt from a permit. Electrical work is also excluded from the $7,500 permit exemption. Your city or county building department issues the electrical permit and inspects it, and an owner may act as their own electrical contractor only on a home they occupy and do not offer for sale or lease.
Get the answer for your exact project
Answer a few questions to see the permits, documents and inspections that may apply in Titusville.
Local detail for Titusville: Building Department is under Community Development; mailing address P.O. Box 2806, Titusville, FL 32781. Online permitting via BS&A. Hours not listed on the official building page.
Florida rules to know for ev charger installation
Section 105.1 of the Florida Building Code, Building requires a permit to install or alter an electrical system, and section 105.2 lists no electrical work as exempt. Electrical work is specifically excluded from the $7,500 permit exemption in Florida Statutes 553.79(1)(g). Florida has no statewide electrical permit office. Your city or county building department issues the electrical permit and inspects the work. An owner may act as their own electrical contractor on a single-family or duplex home they occupy and do not offer for sale or lease, under Florida Statutes 489.503(6).
Documents you may need
- Electrical permit applicationLikely required
- Service load calculation showing panel capacity for the new circuitLikely required
- Charger specification sheet and installation instructionsSometimes required
- Licensed electrical contractor information or owner-builder disclosure statementLikely required
Possible inspections
- Rough electrical inspection if wiring is concealed in walls
- Final electrical inspection
Fees and forms for ev charger installation in Titusville
What the permit costs
- Table A - Permit Fees by Total Valuation: $0 to and including $1,000: $80. Source
- Table A - Permit Fees by Total Valuation: $1,000.01 to and including $2,000: $100. Source
- Table A - Permit Fees by Total Valuation: $2000.01 and up to $100,000: $100 for the first $2,000 and $6 for each additional $1,000 in construction value. Source
- Plan Review fee. The plan review fee shall be fifty % (50%) of the building permit fee. Source
- Application Fee Schedule (when a plan review fee is required): Construction Cost Estimate 5,000.01 to 100,000, Fee: One & Two Family $50. Source
- State Mandated Fee (BCAIB and CILB Homeowners Recovery Fund): 2.5% fee on all building permits; the minimum amount collected on any permit is $4. Source
- Re-Inspection: $100. Source
- Duplicate or Revised Permit Card: $25. Source
Copied from Titusville's official pages on 2026-11-15. Fees change, so confirm the amount with the permit office before you apply.
Frequently asked questions
- Do I need a permit for ev charger installation in Titusville?
- Most likely yes. Ev charger installation usually requires a permit in Florida. Confirm the specifics with Titusville. The documents and inspections sections on this page list what the building department typically asks for.
- Who issues the permit in Titusville?
- The local building department for Titusville handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
- How do I find out the exact requirements for my project?
- Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.