Skip to content
PermitRoadmap

Do I need a permit for accessory dwelling unit (adu) in Homer?

Homer does not issue residential building permits. The City of Homer has no adopted building code, no building inspector and no building inspection program, and does not issue building permits. Its Planning and Zoning staff issue zoning permits, which are required before clearing or construction, including additions.

The requirements below come from Alaska rules and describe the standard the work must still meet. They are not a statement that Homer will issue you a permit.

Permit likely required

Most likely yes. Accessory dwelling unit (adu) usually requires a permit in Alaska. Confirm the specifics with Homer.

Alaska has no statewide accessory dwelling unit law that we found, so whether a second unit is allowed is a local zoning decision, and boroughs must provide for land use regulation (AS 29.35.180). Septic systems are sized at 150 gallons per day for each bedroom, and a modified system must meet the state onsite wastewater rules, including notice to DEC at least one day before work (18 AAC 72.530, 72.015, 72.550). A general contractor needs a residential contractor endorsement to build a privately owned residential structure of one to four units (AS 08.18.025). An owner acting as their own contractor is exempt from registration but limited to one home, duplex, triplex, four-plex or commercial building every two years (AS 08.18.161(11)).

Get your exact answer

Answer a few questions to see the specific permits, documents, and next steps for your accessory dwelling unit (adu) in Homer.

Check my project

Documents you may need

  • Building permit and zoning approval from the borough or city, where requiredLikely required
  • Construction drawings and a site planLikely required
  • DEC septic notification, homeowner approval or plan approval if the unit uses an onsite systemSometimes required
  • Residential contractor endorsement number of the general contractor, unless you build as the ownerLikely required

Possible inspections

  • Footing, framing and final building inspections where a code is enforced
  • Electrical and plumbing inspections where a local or state program applies
  • DEC registration of any onsite wastewater system within 90 days after it is built or modified

Frequently asked questions

Do I need a permit for accessory dwelling unit (adu) in Homer?
Most likely yes. Accessory dwelling unit (adu) usually requires a permit in Alaska. Confirm the specifics with Homer. The documents and inspections sections on this page list what the building department typically asks for.
Who issues the permit in Homer?
The local building department for Homer handles permitting. This page lists its contact details and online portal. Your mailing city is not always the permitting authority, so confirm the jurisdiction before you apply.
How do I find out the exact requirements for my project?
Run the free PermitRoadmap check for your specific project and answers. It returns the likely permits, documents, inspections, and next steps, each linked to its official source.

PermitRoadmap is an independent informational service and is not affiliated with any city, county, state agency, or permitting authority. Results are informational and do not replace confirming requirements with the local permitting authority.